Firstdrop Valkyria almost ready

After all the trouble they had at Liseberg with the digging of the tunnel for Valkyria.
They are now really picking up the pace with setting up the last pieces of track for this rollercoaster.
Today almost all of the firstdrop was installed, except the holdingbrake which will be installed this friday.

Source: https://www.facebook.com/groups/495578810813841/permalink/577951745909880/